Transforming Testing from a Task to a Strategic Mindset - Chisara Nwabara | Craft 2025

June 04, 2026

Transforming Testing from a Task to a Strategic Mindset - Chisara Nwabara (Talk Outline)

A Craft 2025 (Budapest) talk by Chisara Nwabara — service/product specialist, evidence-based program management practitioner, former horse trainer and current dog trainer living in Budapest. Original title: “Why Delivery Projects Fail: Transforming Testing from a Task to a Strategic Mindset.” She sets teams up to solve their own problems (“my favorite part is when people realize they can solve their own problems for themselves”) and argues a testing mindset belongs across the whole product/service life cycle, not just inside the Jira backlog. Structure: confessions → defining success (ready / AC / done) → six pitfalls → takeaways → Q&A.


1. Confessions (the operating principles behind a testing mindset)

1.1 Don’t do more than is absolutely necessary

  • She dislikes wasting energy.
  • Test only what you need now; leave the rest for later.
  • Metaphor: put the big rocks in the jar first, then fill in with the small ones after attacking the biggest pieces.

1.2 Don’t repeat yourself

  • When she finds a pattern, she establishes a pattern or framework so she doesn’t do the same thing again.
  • This may be automation, or simply a preset for a recurring daily task so she can “focus on the net new each time.”

1.3 The only real failure is not learning

  • “The only time I personally believe that I failed is if I’ve done something and I haven’t learned enough from it to know it was a good idea or a bad idea.”
  • Good idea or bad idea, if you learned something, that’s a win.
  • Aside: she finds this useful even in dating — “even if it was a bad connection, I learned something… which means there was growth.”

1.4 Don’t waste time — test the plan

  • The best way to save time is to make a plan and test that plan well.
  • To test something well, you must do at least a little planning up front.

2. Defining Success — Beyond the Jira Backlog

The framework is familiar (the audience confirms “old news”), but she applies it outside coding/engineering/a Jira backlog: definition of ready → acceptance criteria → definition of done.

2.1 Definition of Ready (“Are we ready?“)

  • Ensure readiness before starting — usually a checklist.
  • If you don’t actually have what you need to start, she advises not to start (though people usually start anyway).
  • This does not mean do nothing — it means be honest about what you do and don’t have ready.
  • Her project checklist acts as a litmus: how much do we know now vs. how much is left to figure out. Even without all the answers she’ll start, but she knows what’s next.

2.1.1 Example — a shared project name

  • What you call something makes a difference; most projects she joins have no name, or a name so long nobody knows it.
  • Analogy: “If you called me Chisa today and Sarah tomorrow and Sally the next day and then someone… called me donkey, they’d be like, who exactly are you talking about?”
  • Teams do this to projects — one calls it “operating [X],” another “the compass,” another “XYZ” — burning mental capacity just to reach a common reference point.

2.1.2 Example — scope and scoping evidence

  • How far has scoping gotten? How clear is what’s in/prioritized vs. what isn’t?
  • The checklist enables the initial conversations to locate where the team is and how much is left.

2.2 Acceptance Criteria (“How should it work?“)

  • Capture assumptions and expected behaviors before you build.
  • Yes, this includes unit and integration testing — captured based on behaviors — but it is more than that.
  • Tie acceptance back to the value/outcome you want, not just tasks/outputs: “did it actually achieve the goal that you wanted is really the question.”
  • If you can’t tie AC to behaviors and outcomes, you haven’t done enough refinement (or framed it unhelpfully).
  • Uses the Given / When / Then framework: context (before) → action/event → expected result.

2.3 Definition of Done (“How do we know it’s done?“)

  • Often missing — no agreement on what success looks like.
  • May be another simple checklist; if it’s hard, you’re likely doing too much, under-refined, or lacking a North Star.
  • Failure mode: everyone (you, them, leadership) has a different North Star — which means there is no North Star.

2.3.1 Tangibles

  • Code committed; comments captured.
  • Tests stored, passing, and recorded.
  • Documentation published with user guides, in the hands of actual users.
  • Features deployed with accurate scripts in your version control system.

2.3.2 Intangibles

  • How confident/reliable is the feature? Solid performance? Bug-free (or at least critical-bug-free)?
  • Approval from stakeholders (via conversations or survey).
  • Team health of the delivery team — do they feel empowered, have healthy relationships, communicate safely? (The one most often skipped.)
  • Release readiness — how easy is it to release, get the right people in the room, and make changes to the release.

2.4 Apply “before / during / after” everywhere

  • Not just the Jira backlog — also meetings (should this have been an email or Slack message?), project plans, OKRs and success metrics, and release / go-to-market plans.
  • The mindset: Do we have what we need? Do we know what should happen during? Do we know what’s delivered after?

3. Six Common Pitfalls (Lessons Learned)

3.1 Pitfall 1 — Jumping to solutions too quickly

  • Rushing to a solution doesn’t make you faster; you move fast in the wrong direction.
  • Start with problems, not solutions. She references Sam Newman speaking at the same conference on Einstein’s idea: spend 99% of the time on the problem, 1% on the solution.
  • Clearly capture the problem: context, cause, consequence — edited down to simple terms. If you can’t state it simply, there’s more work to do.
  • Then a hypothesis: “by doing this for these people we will achieve this outcome, and we’ll know when we see this market feedback.”
  • Stop skipping discovery (a.k.a. planning) — but she is not saying spend six months/a year; just plan enough to break it down simply.

3.1.1 Example — the fin-crime procedures project

  • Asked to help a team update procedures within a financial crime department.
  • Stakeholders kept asking “when will it be done?” — she asked how many procedures and how complex; they said “don’t focus on that, just deliver the first one.”
  • There was no system/ecosystem map. She eventually discovered ~15 procedures, a mix of low, medium, high complexity, where complexity = number of steps in the workflow/procedure.
  • From that she could extrapolate time, and have informed conversations about capacity, velocity, and whether the project even made sense to continue.

3.1.2 Mapping Pitfall 1 to Ready / AC / Done

  • Ready: clear problem statement captured/defined; a hypothesis (“we believe by doing X we’ll improve Y”); stakeholders aligned on both.
  • AC: how SMART is the hypothesis — testable, measurable, assumptions documented, success metrics clear.
  • Done: hypothesis tested/completed/analyzed; learnings documented; next steps clearly identified.

3.2 Pitfall 2 — The people doing the doing have no idea why

  • If you can’t draw a line from company vision/mission down to the smallest story/task/subtask, you may be wasting time.
  • Taxonomy metaphor (the animal kingdom — she loves animals): a larger kingdom ties down to every being; everything fits into place. If your company supports animals and you’re working on plants, it may not belong.
  • Draw the line: subtask → story/task → epic → feature → project → product → department, and back up.
  • Loose nod to Conway’s Law — people make sense of environments when they know where everything belongs.
  • Payoff: a clean backlog and clear metrics answer “why is this taking so long?” with visibility, and open the deeper conversation of “does it actually belong / should we focus on something else?”

3.2.1 Mapping Pitfall 2 to Ready / AC / Done

  • Ready: company vision clear, documented, accessible; project objectives explicit and traceable.
  • AC: each story/task maps back up; team members can articulate how their work contributes to broader goals; documentation exists.
  • Done: components aligned; team feedback shows everyone’s on the same page; documentation includes clear taxonomy.

3.3 Pitfall 3 — A brain dump does not a project plan make

  • “If you can’t explain it to me like I’m five” — or to your non-tech mother/partner — executing before your thoughts are clear, concise, and coherent is rough.
  • Clarity is key: state problem/opportunity, solution/hypothesis, and target outcomes/metrics.
  • Plan should be clear up close, blurrier further out, but you can see the road (she notes she has bad vision — an accurate analogy).
  • Know the stakeholders and when to talk to them; agree how the team wants to work; have pictures/artifacts/diagrams/models.

3.3.1 Single source of truth

  • Disparate information lets people create their own “versions of reality” — where projects get sidetracked.
  • Three principles: data must be reliable/consistent; accessible to everyone who needs it; updatable in a timely manner.
  • “For the love of whatever guides you, create a paper trail.”

3.3.2 Example — onboarding time as a litmus

  • On a project last year it took her two months to ramp up because there were no clear sources of truth.
  • After she cleaned up and added taxonomy/structure, subsequent members onboarded in 20 minutes and could start working within a day or two — saving time and boosting new members’ confidence.

3.3.3 Mapping Pitfall 3 to Ready / AC / Done

  • Ready/Do: goals and objectives clear; roles/responsibilities understood; alignment; clear delivery plan before/during/after.
  • AC: simplicity of the plan; key deliverables/milestones clear; communication in place; consistent terminology regardless of who’s talking (a glossary saves parsing time).
  • Done: plan executed with minimal confusion/rework; team feedback shows understanding/alignment; outcomes align with goals.

3.4 Pitfall 4 — Assuming everyone understands the assignment

  • If everyone actively involved doesn’t get it, you haven’t done enough yet — all should know what success looks like and describe it the same way.
  • She spends a lot of time driving shared understanding (“even though we all know it, we still don’t spend enough time working to achieve it”).
  • Collaborate early, align often: who’s in the room, what they need, when, and how you know they got it.

3.4.1 Example — building a release train

  • On her last team, they struggled to include stakeholders from other teams at the right time.
  • Stakeholders were frustrated at being excluded from conversations affecting their backlogs; teams called them “difficult” and stopped engaging them.
  • By the time they engaged, they’d give stakeholders one to two days’ notice — unrealistic — causing timeline delays because the timelines were never accurate.
  • Fix: she pulled all needed stakeholders together and asked them to help design the release plan. “Leave no one behind.”

3.4.2 Mapping Pitfall 4 to Ready / AC / Done

  • Ready: stakeholders identified early; a communication/go-to-market plan; team has access to information for informed decisions.
  • AC: stakeholders understand scope/objectives; regular check-ins; feedback mechanisms in place.
  • Done: stakeholder feedback confirms alignment; progress with active collaboration and minimal roadblocks; deliverables meet expectations.

3.5 Pitfall 5 — You’re doing too much

  • Doing too many things at once invalidates the experiment — you can’t isolate variables.
  • Revision of Isaac Newton (“what goes up must come down”) → ”what goes in must come out”: put in too much, unprioritized or low-quality, and “you’re going to get poop out.”
  • The stomach only holds so much; even shared among people, bad-quality input = bad output.
  • Costs: increased mental load, capacity/capability strain, quality-vs-quantity tradeoffs, inaccurate outcomes (can’t isolate variables), and accumulating debt/stress on the system.

3.5.1 Mitigations

  • Partial implementations; test the riskiest assumption first; low-hanging fruit; feature flags; prototypes / pilots / phased releases.
  • Dog-food analogy (she’s a dog trainer): switch a dog’s diet gradually — 100% old, then 80/20, 60/40, 50/50, and so on. Do the same with teams: prototype, pilot, phase. “I’m not saying feed them dog food.”
  • Capacity planning based on actual capacity: what’s feasible, what’s sustainable, is there a buffer, and remembering these are real human beings.

3.5.2 Mapping Pitfall 5 to Ready / AC / Done

  • Ready: scope clear; features/tasks IDed; team agrees essential vs. optional (ruthless prioritization).
  • AC: criteria prioritized/established/followed; feedback loops working and built into development; iterative releases planned for early feedback.
  • Done: delivered with prioritized features on/near time; feedback collected for future iterations; team reflects on scope and adjusts (in-sprint or out).

3.6 Pitfall 6 — Fumbling the order of operations

  • “Writing the test after you finish the exam.” Many teams say they’ll write tests “when we finish delivering.”
  • TDD is not just for coding. Order of operations = state the question/opportunity/problem → your believed answer → attempt to solve → learn from the variance.
  • “No contract meant everything and nothing was right.”
  • Saying: ”those who stand for nothing will fall for everything” (she invites a Hungarian equivalent via Slido). Write it down or scope will creep.
  • Especially salient with an approver/sponsor: a written (or unspoken) “contract” of the last decision helps manage and avoid scope creep (“this is actually what we talked about”).

3.6.1 Mapping Pitfall 6 to Ready / AC / Done

  • Ready: testing strategy defined before development; order of operations documented/agreed; resources/tools available.
  • AC: tests written/executed in correct sequence; results analyzed/documented; variance measured/captured.
  • Done: testing completed with clear result documentation; insights shared to inform future work; outcomes align with the defined order of operations.

4. Who Owns This? & Takeaways

4.1 Ownership

  • She’s often asked “isn’t this the project manager’s job?” — partly hers, but everybody is responsible for quality and accountability within a team.
  • Leaving question: “How might we make it safe for people to do the right thing?”

4.2 Recap and key takeaways

  • Start with an opportunity/problem and a hypothesis; ensure clarity and alignment; prioritize and iterate; follow the correct order of operations.
  • Be honest — being disciplined about accountability is hard; honesty (even with yourself) about how much accountability you have makes it easier and means you won’t “take that burden home.”
  • Test your riskiest assumptions first.
  • Seek significant results over “I don’t know” — a yes or a no is fine; “I don’t know” makes decisions hard.
  • Plan first, then act.
  • Offers a free ebook (via QR code) on introducing product/testing mindset; more at chisology.com and her LinkedIn.

5. Q&A

Q1 — Clarity on technical epics where you must dive in to define requirements?

  • Spike it, time-boxed. If you need more time, readjust the spike; add another spike, revisit, regroup.
  • From her platform-engineering / cloud work, introducing technical product management meant helping people think through end users (here: system operators and developers) and that even complicated work benefits from a visual/frame of the solution.

Q2 — How do you handle pushback / no engagement so you don’t carry all the mental load?

  • Agree to disagree: sometimes do it their way while writing down your concerns and the pros/cons; collect insights in the background and revisit later. Sometimes the team’s right, sometimes she is.
  • It’s fine to try someone else’s idea first if it’s an experiment — but keep your sanity, and always collect insights to revisit.
  • “You can only lead a horse to water” — at some point you decide how much you’re willing to live with.

Q3 — How do you achieve common terminology when stakeholders and developers use different terms?

  • Start a glossary. Do a gap analysis (what this team calls it vs. what we call it vs. what we’ll call it going forward).
  • A Confluence wiki page, alphabetized, running through terms one by one — either as a map of how people say it, or to agree “as a team, can we call it this?”
  • Writing it down (board/paper/one place) reveals either how ridiculous the sprawl is, or that the terms are genuinely needed (industry standard vs. system-built).
  • Interviewer: a mentor’s mentor said “if it’s not written down it doesn’t exist” — “if a tree falls in a forest.”

Q4 — Can you explain “TDD is not just for coding” with examples?

  • Nods that a colleague is also speaking on behavior-driven development, and much of this talk overlaps.
  • TDD = write tests, then let them drive how you develop. Her postulate: everything is an experiment — capture your ideas at the start and isolate as many variables as possible so you know what outcomes you’re driving toward.
  • (Offers to give more examples one-on-one afterward.)

6. People & References Cited

  • Chisara Nwabara (“Chisa” / Chisology) — speaker; service/product specialist; former horse trainer, current dog trainer; site chisology.com; free ebook on product/testing mindset.
  • Sam Newman — speaking at the same conference; referenced re: the Einstein 99%/1% problem-vs-solution idea.
  • Albert Einstein — attributed idea: spend 99% of time on the problem, 1% on the solution.
  • Isaac Newton — “what goes up must come down,” which she revises to “what goes in must come out.”
  • Conway’s Law — loosely referenced re: organizing people/information so work fits.
  • A colleague speaking on Behavior-Driven Development (referenced in Q4).
  • Given/When/Then and SMART — frameworks referenced.
  • Tools/venues mentioned: Jira, Confluence, Slido, Craft Conference (Budapest).