At Craft 2026, Tesco Technology engineers Yulia and János explain how a 13-engineer London/Budapest team operates Inter-Service Communication (ISC), a tier-0 platform carrying more than five billion HTTP calls daily. János covers architecture, safe configuration, and zero-downtime cell deployments; Yulia covers synthetic service indicators, disaster recovery, human-controlled AI adoption, hard-earned product and team lessons, and audience Q&A.

1. Scale and criticality

1.1 Tesco and the team

  • Tesco holds roughly 29% of the UK grocery market.
  • ISC belongs to the Engineering Effectiveness platform organization.
  • The team has 13 engineers, one product manager, and one engineering manager across London and Budapest.

1.2 Why centralize communication

  • Hundreds of teams and thousands of engineers create an unmanageable map of service relationships.
  • Audit, discovery, security, and traffic-management concerns otherwise recur in every team.
  • Clients include web and mobile applications and devices in more than 40,000 stores.
  • Services span public cloud and multiple data centers.

1.3 The ISC bargain

  • ISC carries all service-to-service and external-to-service HTTP traffic.
  • It processes more than five billion API calls per day.
  • Checkouts, tills, supply chain, and retail operations all depend on it.
  • Centralization simplifies consumers while making ISC itself a systemic dependency.
  • The team must change it continuously without breaking it.

1.4 Tesco’s six service tiers

  • Tiers run from tier 0, most critical, through tier 5.
  • A tier defines availability, redundancy, failover, recovery time, data-loss window, and total-loss recovery expectations.
  • Business continuity, users, product management, and infrastructure service management agree on the derived tier.
  • A team does not simply choose its preferred classification.

1.5 Tier-0 operating targets

  • Two engineers are on call around the clock.
  • ISC runs in two cloud regions with three availability zones each.
  • Its availability target is 99.995%, equivalent to under 2 minutes 11 seconds monthly downtime.
  • The stated annual allowance is about 26 minutes 18 seconds.
  • Actual downtime in the prior year was below 32 seconds—at least six nines over some periods.

2. Platform architecture

2.1 Data and control planes

  • The data plane carries live HTTP requests.
  • The control plane stores and distributes desired routing behavior.
  • This separation keeps consumer configuration away from the request hot path.

2.2 Envoy gateways

  • Envoy is a dynamically configured L4/L7 proxy created at Lyft and donated to CNCF.
  • Private gateways handle east-west traffic among Tesco services and stores.
  • Public gateways handle north-south traffic from delivery apps, partners, mobile clients, and other external sources.
  • Gateways route, terminate TLS, modify requests, and apply timeout and retry behavior.

2.3 Global rate limiting

  • A rate limiter sits on every request’s hot path.
  • It makes allow/deny decisions using global counters and control-plane data.
  • Usage reports flow back to the control plane, which returns updated limit information.

2.4 Traffic Config Service

  • Consumers declare desired routing and traffic-management rules in configuration files.
  • A traffic-ctl CLI talks to the Traffic Config Service API much as kubectl talks to Kubernetes.
  • The API offers a stable, opinionated abstraction over Envoy’s complexity.
  • It persists configuration, translates it into Envoy xDS, and pushes it to gateways.

3. Consumer changes that cannot break everyone

3.1 Syntactic validation

  • The service first verifies valid YAML.
  • It verifies that payload shape matches the platform data model.
  • This catches malformed input before transformation.

3.2 Semantic validation

  • The service checks configuration both alone and against other tenants.
  • It detects conflicting paths.
  • It checks rate-limit coherence.
  • It requires appropriate health-check paths and expected statuses.

3.3 Static checks still diverge from Envoy

  • At scale, an input inevitably passes the team’s validators but fails Envoy’s own rules.
  • Pushing that configuration directly can cause a total platform outage.
  • Reimplementing another system’s acceptance logic is not equivalent to testing the system.

3.4 Dry-run gateway sidecars

  • Every Traffic Config Service pod runs an Envoy sidecar configured like a live gateway.
  • The sidecar carries no production traffic.
  • New xDS configuration is applied there first.
  • Success gives a green light; failure rejects the batch, logs it, and returns feedback.
  • Tier-0 principle: static validation is necessary but insufficient—validate with the real implementation.

4. Cell-based deployment

4.1 A complete platform cell

  • A cell wraps both control and data planes.
  • Each of two regions contains two identical cells.
  • Workloads span three availability zones and autoscale.
  • Each of the four cells can carry the entire production load alone.

4.2 A stage and its promotion path

  • A stage comprises both regions and all four cells.
  • The pipeline builds and tests artifacts, then promotes through sandbox dev, organization dev, organization staging, and production.
  • ISC treats organization dev and staging as production because consumer teams cannot integrate without them.

4.3 Cell ordering

  • Deployment alternates regions: first cell one in each region, then cell two in each.
  • A failure therefore leaves redundant capacity in both geography and version.
  • The rollout gathers evidence incrementally rather than changing the fleet globally.

4.4 Drain, deploy, test, and restore ingress

  • The pipeline disables ingress and gracefully drains existing connections.
  • It deploys the new version.
  • Integration tests exercise components and dependencies.
  • End-to-end tests exercise core user journeys.
  • Ingress is restored only after tests pass.

4.5 Canary and stage rollback

  • Canary metrics compare signals before and after rollout for up to 20 minutes.
  • Success promotes to the next cell and stage.
  • Any failed step rolls the entire stage back to its last known-good version.
  • Pipeline-managed cell state allows deployment, observation, and rollback without losing service capacity.

5. Knowing the service works

5.1 SLI, SLO, and SLA

  • An SLI is the measured indicator, such as success rate.
  • An SLO is the internal target for that indicator.
  • An SLA is the promise made to consumers.
  • Liveness is insufficient; the team needs evidence that users’ complete journeys work now.

5.2 Why synthetic signals

  • Production traffic contains retries, spikes, client bugs, and seasonal variation.
  • Synthetic probes provide stable signals suitable for SLOs.
  • They answer platform-health questions rather than replacing functional and end-to-end feature tests.

5.3 Monitor Service as client and upstream

  • Monitor Service sends requests through private and public gateways.
  • It also receives those requests as the upstream service.
  • It submits control-plane configurations and verifies their propagation.
  • Monitoring data is stored outside ISC so an ISC outage cannot erase its evidence.
  • The team deploys and tests monitoring as a first-class production component.

5.4 Every data-plane journey

  • Probes cover same-region, cross-region, cross-subscription, public, on-premises, and intra-domain paths.
  • Different infrastructure underlies each journey.
  • Tests run roughly every five seconds.
  • Alerts identify the failed path and affected consumer class before consumers report it.

5.5 Independent external monitoring

  • A separate external system tests the internet-to-public-gateway route.
  • It validates the actual external consumer perspective.
  • It also distinguishes a Monitor Service failure from an ISC failure.
  • Independent internal and external probes avoid a monitoring single point of failure.

6. Control-plane and rate-limit SLIs

6.1 Configuration-propagation measurement

  • Monitor Service submits a small test service.
  • It polls gateways until each can serve it with HTTP 200.
  • Submission-to-success time measures propagation.
  • This exposes slow delivery, connection trouble, and validation failures experienced by consumers.

6.2 Monitoring creates its own load

  • Every test configuration makes Traffic Config validate and distribute work.
  • Envoy creates health checks for every submitted service.
  • Aggressive polling burdens gateways and control plane.
  • The safety system must not become the incident source.

6.3 Propagation SLI version 1

  • The first version submitted one configuration every six hours.
  • It required one gateway to return 200.
  • It provided immediate basic value but could miss failure on nine other gateways.

6.4 Propagation SLI version 2

  • The second version required every gateway to return 200.
  • It verified complete distribution.
  • Six-hour frequency still left a long detection gap.

6.5 Propagation SLI version 3

  • The third iteration tightened frequency to catch failures sooner.
  • Each release added confidence without abruptly loading the critical system.
  • The pattern is to ship a useful small signal and improve it safely.

6.6 Rate-limiting SLI

  • Monitor Service submits configuration containing known limits.
  • It sends traffic at and above those limits.
  • Results exercise configuration, sidecar tracking, central aggregation, and enforcement together.
  • The team balances test strength against artificial load on the hot path.

7. Disaster recovery

7.1 Back up beyond Azure dependencies

  • Databases, secrets, blobs, and artifacts are copied on a schedule.
  • Recovery storage is independent of Azure.
  • A regional or provider-control-plane failure must not remove both service and recovery material.

7.2 One-click restore

  • Recovery cannot depend on Azure DevOps remaining available.
  • Any engineer can run a script to reconstruct ISC in a new subscription.
  • Restore procedures are executable rather than documentation-only aspirations.

7.3 Practiced DR sessions

  • Facilitators break a production-like environment without telling investigating subteams what changed.
  • Teams diagnose, mitigate together, and conduct a retrospective.
  • Every exercise seeks missing alerts, runbooks, documentation, and system safeguards before a real incident does.

7.4 DR evolves from manual to chaos automation

  • Early sessions required facilitators to prepare and inject failures manually.
  • A standardized scenario library improved repeatability but exercised only anticipated failures.
  • Azure Chaos Studio reduced preparation toil and broadened failure injection.
  • Recovery should become boring; stress signals insufficient practice.

8. AI in a tier-0 system

8.1 Human-controlled responsibility split

  • Humans own discovery, problem framing, architecture, and high-level design.
  • Humans perform final review and approval before merge and production deployment.
  • AI assists implementation, review, documentation, and test writing.
  • The policy reflects platform criticality, a 13-person mixed-experience team, and rapidly changing models.

8.2 Trust grows in stages

  • The team began with code explanation, documentation, and suggestions.
  • Shared low-risk experience upskilled the team.
  • It advanced to AI-written production code with human review.
  • Specialized task workflows followed.
  • Agents now query external metrics and documentation for richer system context.

8.3 Future applications

  • Incident assistants could combine logs, metrics, and recent changes during a 2 a.m. page.
  • Pipeline agents could diagnose failed deployments and suggest repairs.
  • Consumer assistants could answer platform questions and reduce support load.
  • Tier-0 guidance: do not revolutionize overnight; expand use when evidence earns trust.

9. Lessons from mistakes

9.1 Unused features

  • The team spent substantial effort on capabilities few consumers needed.
  • Technically interesting work displaced more urgent platform problems.
  • It shifted from “which feature?” to “whose problem, how severe, and why now?”
  • Earlier consumer discovery validates demand before engineering commitment.

9.2 DNS outage without a canary

  • An early DNS change broke resolution for a subset including critical consumers.
  • One global push had no canary or preproduction detector.
  • The team added canary rollout and automated promotion checks.
  • Resolution journeys joined end-to-end tests and synthetic SLIs.
  • Each incident should permanently strengthen the safety net.

9.3 Self-service nobody discovered

  • Hundreds of teams directed every question and investigation to ISC engineers.
  • Initial dashboards, documentation, and CLI tools saw little use because consumers could not find them.
  • Early dashboards exposed every metric and overwhelmed nonexperts.
  • Consumer conversations drove simpler, audience-appropriate views.
  • A channel bot improved discovery and education shifted support toward self-service.

9.4 London/Budapest silos

  • Too many work streams, informal local decisions, and knowledge in individuals’ heads divided the team by location.
  • Quarterly offsites, regular office days, and hackathons increased face time.
  • Epic channels, show-and-tells, and decision records moved context across locations.
  • Fewer parallel streams and deliberate pairing spread knowledge.
  • Retrospectives and health checks made accountability routine.
  • Team architecture matters as much as technical architecture.

10. Audience Q&A

10.1 Q1 — Does draining ingress require a queue?

  • Disabling ingress stops new connections and waits for existing ones to drain.
  • DNS is changed so new requests route elsewhere.
  • Four cells provide same-region and cross-region backups.
  • HTTP input therefore needs no queue during one-cell deployment.

10.2 Q2 — Does production have less capacity during deployment?

  • Yes, one cell is removed, but every cell is performance-tested against the full production load.
  • Three cells normally remain active during the rollout.
  • Even three unavailable cells leave one capable of serving all traffic.

10.3 Q3 — What do the speakers like about Tesco Tech?

  • The system’s scale and visible effect in nearby Tesco stores make the work meaningful.
  • The joke is that this helps sleep only when on-call does not page.
  • The team has autonomy rather than waterfall instructions.
  • Engineers can innovate and use current technology.

10.4 Q4 — How is API compatibility handled during canaries?

  • Canary analysis primarily evaluates traffic behavior, not compatibility.
  • API changes must remain backward- and forward-compatible.
  • API versioning supports evolution.
  • A cell is deployed and tested before ingress returns.

10.5 Q5 — Are lower stages exact production replicas?

  • The basic architecture is consistent across production, staging, organization dev, and other environments.
  • Exact production scale would be prohibitively expensive.
  • Lower stages use smaller and fewer nodes while preserving topology and autoscaling concepts.
  • A database-dependency question was not answered because its meaning was unclear.

11. People & References Cited

11.1 People and organizations

  • Yulia and János — Tesco Technology speakers and ISC engineers.
  • Tesco Technology Engineering Effectiveness — platform organization operating ISC.
  • Lyft — original developer of Envoy.
  • Cloud Native Computing Foundation — current Envoy project home.

11.2 Systems and tools

  • ISC — Tesco’s centralized Inter-Service Communication platform.
  • Envoy and xDS — gateway proxy and dynamic configuration protocol.
  • Traffic Config Service and traffic-ctl — control-plane API and consumer CLI.
  • Kubernetes and kubectl — analogy for the declarative configuration flow.
  • Azure, Azure DevOps, and Azure Chaos Studio — infrastructure, delivery, and failure-injection technologies.
  • SLI, SLO, SLA, synthetic probes, cells, stages, canaries, and DR — principal reliability concepts.

Video: https://www.youtube.com/watch?v=UOgsOKzjnC0 — Transcript via yt-transcript.sh; outline generated from the transcript.


Profile picture

Written by Tony Vo father, husband, son and software developer Twitter