Panel about probabilistic forecasting - Group talk | Craft 2025

June 04, 2026

Panel about probabilistic forecasting - Group talk (Panel Outline)

A Craft 2025 panel discussion, hosted by Daniel Terhorst-North (“just for the record, I haven’t got a clue what I’m doing here — I’m here to learn”), with four panelists: Daniel Vacanti (works with Colleen at ProKanban.org, author of the books Nigel read to prepare), Colleen Johnson (CEO of ProKanban.org), Nigel Thurlow (self-described “lean guy” with a Deming background), and Gaia Bashiri (a trained statistician who left academia and now works as a solution & delivery manager in insurance risk management, joining remotely with audio feedback problems). Format: opening position statements, then a topic-by-topic debate that the host himself declares “failed” because the panelists never got past the fundamentals — they fundamentally disagreed on the meaning of distribution, stability, and predictability. This outline threads the conversation by topic. (Dave West is referenced as being in the audience.)


1. Setup and Framing

1.1 The host’s disclaimer

  • Terhorst-North opens self-deprecatingly: his wife told him to cross his legs when sitting elevated on stage.
  • He admits: “I haven’t got a clue what I’m doing here… I’m here to learn.”
  • All he knows “because I can read” is that the topic is probabilistic forecasting and methods.

1.2 Genesis of the panel

  • The host jokes the panel came from “Daniel something something probabilistic forecasting and Nigel something something” — i.e. a disagreement between Vacanti and Thurlow.
  • He proposes a sensible start: go around, introduce yourselves, and give a position statement on probabilistic forecasting in the context of software / digital product development.

2. Opening Position Statements

2.1 Daniel Vacanti’s position

  • “It is impossible to manage software development without managing risk.”
  • “And it is impossible to manage risk without some type of forecasting.”
  • The host reacts: “That second statement’s a bit racy. Totally with you on the first one.”

2.2 Gaia Bashiri’s position

  • Introduces herself: works in insurance (“civic insurance”) as a solution and delivery manager — i.e. actually in risk management.
  • Thanks the panel for bringing the risk-management topic into the discussion.
  • She is a trained statistician: “all for a data-driven approach” but “painfully aware of the shortcomings of statistics.”
  • Therefore she is hesitant to embrace probabilistic forecasting when it comes to her own deliveries.
  • The host frames her as someone with academic chops now applying them as a day job — “very cool.”

2.3 Colleen Johnson’s position

  • CEO of ProKanban.org.
  • Probabilistic forecasting “provides a better starting point for teams to understand when something will be done.”
  • It does this without a lot of overhead — no need to define exactly what is being delivered, and no estimating “in hours or points or insert anything after estimating.”
  • The host quips: “without estimating period.”

2.4 Nigel Thurlow’s position

  • “I make notes because I’m old.”
  • He doesn’t disagree with anything said — he may disagree with methods, but not with managing risk.
  • Quotes Deming (noting Dave in the audience may disagree, as a complexity guy): “a system must be understood as a whole, not in parts.”
  • “Forecasting without understanding variation leads to tampering.” He’s a “big lean guy.”
  • On scale: when you scale, the complexity of the work doesn’t increase — the complexity of the communications, interactions, and organization increases significantly.
  • At scale with many teams, no two teams are identical, so you need a way to “find the long hole in the tent.”
  • He wants to learn as much as anyone.

3. Debate: What Is “Empirical Sampling”?

3.1 Nigel’s preparation

  • He read Vacanti’s books to prepare, and also asked Grok and ChatGPT for summaries.
  • He states plainly he is “not a statistician… I know absolutely nothing about stats and maths — that’s why Gaia is here.”

3.2 Defining empirical sampling

  • Nigel: the method has been described as empirical sampling.
  • Vacanti clarifies: the method used to forecast a probable date/outcome uses the data your own system created — i.e. historical data to sample the future.

3.3 Nigel’s core discomfort

  • If we use past data to forecast the future, we assume the future looks very much like the past.
  • So why use this particular approach? If the distribution is changing and the variation is changing significantly, you’d need to know what type of model to apply — you wouldn’t just use the raw data.

4. Debate: What Assumptions Are We Making?

4.1 The host reframes the concern

  • Terhorst-North reframes Nigel’s question: we feed evidence from our existing system of work into “some forecasting machine” that produces projections about a possible future state.
  • Key questions: How do we know it holds water? What assumptions are we making — both the ones we know about and the ones we don’t even know about? How do we know the machine tells us anything useful?

4.2 Vacanti’s stated big assumption

  • The essential assumption: the future we’re trying to predict roughly looks like the past we have data for.
  • “Most of the time that’s a fairly safe assumption” — there are times it isn’t, but usually the variation incurred in the past can reasonably be expected in the future.

4.3 “Probabilistic forecasting” as a tautology

  • Vacanti: he’s uncomfortable with the term because all forecasting is probabilistic in nature — so “probabilistic forecasting” is a tautology.

4.4 The quantifying-variation exchange

  • Vacanti: because there is always variation in past data, how could you ever know the future without some way to quantify that variation?
  • Example of throughput variation: “my team got zero things done this day, two this day, one this day, nine this day.”
  • If that variation continues into the future, you need a way to quantify what it looks like going forward.

4.5 Nigel pushes back on variation size

  • Nigel: you said the future can be modeled from past data; so the past variation is “probably very small.”
  • Vacanti: “Not necessarily” — and they’d have to define what counts as small vs. large.
  • Nigel invokes Deming: Deming makes clear how to characterize variation — a better starting point than “large or small.”
  • Nigel returns to his fundamental question: “What type of distribution are we talking about here in the work?”

5. Debate: “Is There a Distribution?” (Central Disagreement #1)

5.1 Vacanti: “There is no distribution”

  • Vacanti flatly states “There is no distribution” — twice.

5.2 Gaia: “There is always a distribution”

  • The host turns to his statistician: “I heard the word distribution… help us make this make sense.”
  • Gaia: “There is always a distribution.” What Vacanti assumes is the empirical distribution.
  • You are assuming the distribution is completely represented by the past data — that is itself a very strong assumption.

5.3 Vacanti’s clarification

  • Vacanti corrects: there is no well-known statistical distribution — not a normal distribution, not a log-normal distribution — “it’s just your data.”
  • Your data can be represented, but it is not a well-known statistical distribution.

5.4 Gaia on non-parametric convergence

  • Gaia agrees it’s an empirical distribution, which means you’re using non-parametric statistics.
  • Non-parametric methods only converge when you have enough data.
  • She’s read that “a few weeks of data would be enough” — but that is not enough for a non-parametric method to converge to something statistically meaningful.

5.5 Gaia’s scale concern

  • At scale there are dependencies across teams and projects.
  • Her concern: can she move capacity from one team/project to another when needed?
  • If you refuse to model complexity (as Colleen said — no sizing, no points), how do you use the raw data to derive a meaningful, statistically-driven KPI to manage teams?

5.6 The host replays Gaia (audio issues)

  • Because Gaia’s audio is muffled (“we’re hearing you bounce off a curtain”), the host replays what he heard:
    • The distribution is simply the empirical data — “the shape of the data we happen to measure.”
    • Question 1 (which he wants to explore): what are we actually trying to estimate — or, he suggests, approximate / learn about / have an opinion about?
    • Question 2: transferability — does what you learn from one project’s data necessarily apply to the next?
  • Gaia adds: with big teams there’s additional complexity, and using only the data means you’re not modeling complexity — which may be the hindering effect in planning.
  • The host concedes: beyond a certain complexity you get too much emergence and dynamic behavior to model.

6. Debate: Data Sampling in Practice (Colleen)

6.1 Like-for-like samples

  • Colleen: don’t use December data (everyone on holiday) to forecast a March delivery — use like-for-like sample sets.

6.2 Work-in-progress matters more than headcount

  • The number of people on a team matters less for shifting capacity.
  • How much work is in the system (work-in-progress) has a more direct relationship to throughput than shuffling people around.
  • The metric used is throughput, fed into Monte Carlo simulations.

6.3 Every day is a new data point

  • As you add someone to a team, throughput may start to increase — that’s what you’re hoping for.
  • You keep reforecasting with each new data point (whether zero or nine items done).
  • You rerun the forecast “pretty much every day” to check whether risk for the forecasted date is increasing or decreasing.

7. Debate: “Distributions Are Made Up”

7.1 Nigel’s challenge

  • Nigel: “there must be a distribution because all mathematicians and statisticians look at data sets and can see a type of distribution — Gaussian, normal, log-normal, something.”
  • Vacanti: “Those are made up. Those are mathematical hacks.”

7.2 Gaia on models as constructs

  • The host relays to Gaia: “apparently it’s all made up.”
  • Gaia: to an extent true — like a physics model (e.g. Einstein’s relativity), a distribution is a made-up construct to explain reality.
  • The real question is whether it is useful, which is a different question.

8. Debate: Monte Carlo — The Right Tool, Used Wrong?

8.1 Confirming the method under discussion

  • The host asks whether everyone is talking about Monte Carlo simulation building distributions as a forecasting tool, or some other toolset.
  • Vacanti: “I’m probably talking about Monte Carlo simulation.”

8.2 Nigel’s “Monty Python syndrome” article

  • Nigel wrote an article a couple of years ago titled “Monty Python Simulation” — the idea that “we’re doing an awful lot of this.”
  • He attributes the phrase “Monty Python syndrome” to Dave West.
  • Two-part thesis: (a) we’re using the wrong tool, and (b) we’re using the tool wrong.

8.3 How Monte Carlo is supposed to work

  • The host’s understanding: you have a set of ideally independent variables whose distributions you know, generate a realistically random sequence, feed a model, and use the distribution of results to make predictions.

8.4 “Using the wrong tool” — the assumptions he doesn’t buy

  • As a “software guy, 30-odd years in software,” he doubts you can (a) identify which variables genuinely and independently affect the outcome, and (b) be confident about each one’s probability distribution.

8.5 “Using the tool wrong” — the single-project misuse

  • The valid question: “I’ve got a portfolio of 100 projects — what’s the likelihood that 10 make it?”
  • The misuse: asking “How will this next project work? What is the likelihood?”
  • Analogy: asking about a single project is like asking about a single surgery outcome — “Is the patient going to die? We don’t know yet, we haven’t done the operation.” The tool doesn’t work on a single data point.
  • He acknowledges the ProKanban folks apply it “a lot more grown up” than most places he sees.

9. Debate: Forecasts Become Targets (Management Problem)

9.1 Shared clients

  • Nigel notes some companies running the simulation were trained by Vacanti and are also his own clients.
  • Aside on professional respect: the host jokes “Do you talk about each other behind your backs?” — “No… this professional respect.”

9.2 The 85th-percentile-becomes-a-target problem

  • Clients generate an 85th-percentile probable forecast (85% probability of being done by a date/range).
  • That figure then becomes a target.
  • On rerun, assumptions turn out wrong — the 85% date shifts a month, and now the same date is only ~40% probable.
  • Management doesn’t want to hear that — so this is a management problem, not a tooling or math problem.

9.3 Nigel’s variance-and-averaging challenge

  • Monte Carlo is used in stock markets and gambling — wide variance, random values, large data sets, known distributions.
  • If you have very small variance and a small amount of data, are you really doing Monte Carlo, or just a different form of averaging?

10. Debate: Two Meanings of “Variance”

10.1 The host as peacemaker

  • Terhorst-North: there’s a semantic disconnect — Nigel’s use of “variance” differs from its meaning in this kind of modeling.

10.2 Process variance vs. throughput variance

  • Nigel’s “variance” = process variance in a lean sense.
  • In this model they use throughput: e.g. “a day, two days, three days” pattern = small variance; jumps like “5 weeks, 2 days, 27 weeks” = large variance.
  • Nigel objects that “5 weeks, 2 days” sounds like cycle time / duration, not throughput — Vacanti concedes the point but they decline to go down the cycle-time/lead-time rabbit hole.

10.3 The stable-system-therefore-just-average argument

  • Nigel: a pattern like “3 2 3 2 1 4 3 2 3 2 1” is low variation — “a reasonably stable system.”
  • He cites Vacanti’s own 2019 article on Little’s Law, which assumes the system is stable.
  • If the system is relatively stable, why not use standard lean averaging — cycle time, lead time, takt time, throughput, process cycle efficiency — which “served us pretty well”?
  • The Deming point: if you reduce variance so the system is predictable, why do you need a simulation tool?

10.4 Nigel: the problem is beyond the work

  • He believes the problem isn’t in the work but in the greater system around it — variation from management, red tape, bureaucracy.
  • The focus is wrong: instead of getting a probability of when work will be done, ask “Why are we having to do this to get a probability?”

11. Debate: Stable vs. Predictable (Central Disagreement #2)

11.1 Gaia “man-explaining” Nigel

  • The host turns to Gaia; she jokes she’ll “man-explain what Nigel just said.”
  • Reframed contrapositive: if a system is stable enough for Monte Carlo to model it, then it’s stable enough to use simpler statistical tools — so why bother with Monte Carlo?

11.2 Gaia on bootstrapping and variability

  • What you’re doing is bootstrapping a non-parametric simulation; Monte Carlo requires a distribution or stochastic process as an assumption.
  • “There’s nothing wrong with variability” — but variability means you need far more data for the model to converge.
  • With large variability, even sampling daily, how many weeks/observations would you need to converge?

11.3 Gaia’s management-communication objection

  • If she tells senior management “there’s an 85% chance this project succeeds,” they won’t understand.
  • If she lands in the failing 15%, they won’t say “you told me it could fail” — they’ll say “you told me 85%, why didn’t you succeed?”
  • She understands confidence intervals — but her world of risk management people are trained in it, and even they don’t use percentiles with management.
  • In insurance, calculating capital for solvency (Solvency) reasons, they look at the 99.5th quantile of the worst event — but never say “99.5 percentile” to management. They say “a 1-in-200-year event,” which management understands (even if it’s not strictly correct).

11.4 Forecasting as a communication tool

  • Vacanti: “the underlying all of this is we’re using this as a tool for communication.”
  • If practitioners can’t articulate what it means, “we’ve already lost — it doesn’t matter how good the tool is.”

11.5 The 85% vs 95% confidence problem

  • Vacanti: he’s never met a professional outside the “stochastic academic world” who could explain the difference between an 80% and 85%, or 85% and 95%, confidence interval.
  • His own understanding: run many statistically-significant samples and 15% will fail — but a single sample tells you nothing about itself until run.
  • This is where the tool gets misused: “What’s the likelihood of this project overrunning? — we don’t have a tool for that.”

12. A Success Story: Throughput Distributions

12.1 Where it works well

  • Vacanti: a place he’s seen it used successfully is getting a distribution for throughput of features/stories/work items in a software delivery team.
  • Using historical throughput/lead time to predict how many items are likely to ship — “a good and relevant statistical tool.”
  • It enables “grown-up conversations about ranges of things we’re likely to ship in a period of time.”
  • The 85-vs-95% framing, though, just confuses people — exactly Gaia’s point.

13. Debate: Reframing Risk to Executives (Colleen)

13.1 Flipping the confidence statement

  • Colleen: telling executives “85% chance we deliver by June 15th or earlier” really means “15% chance it will be later” — you’re talking about risk.

13.2 A dropping percentage invites hard questions

  • If two weeks later confidence drops to 60% for June 15th, that “invites them to ask hard questions”: Did throughput change? Team capacity? Added scope? A different feature? People pulled away?
  • You can’t have that conversation if you simply go back and change the date.
  • Communicating that risk increased lets you troubleshoot the system contributing to the risk.
  • Nigel: vocabulary aside, that’s a sensible conversation.

14. Debate: “What Happens When the Future Doesn’t Look Like the Past?”

14.1 Nigel’s question

  • Assuming a relatively stable system modeled from historical work (with small, countable items, not heavily refined requirements): what happens when the future does not look like the past?
  • How do we even know the future doesn’t look like the past if we haven’t written some requirements?

14.2 The host: you need an opinion about the future

  • Terhorst-North: to have that conversation you need an opinion about what the future should look like — otherwise the future is “just more stuff.”

14.3 Vacanti’s life-analogy retort

  • Vacanti: “What’s your historical precedent for when you’re going to retire? For whether you’ll get cancer? For how many children you’ll have before you have children?”
  • Nigel: “The context matters” — those are very different contexts.
  • Vacanti: context matters, and in the context of sustained work over time with a relatively stable system, you can forecast.

15. Debate: What Does “Stability” Actually Mean? (Central Disagreement #3)

15.1 The Princess Bride jab

  • Vacanti (to Nigel on “stable”): “You keep saying that word — I don’t think it means what you think it means.”

15.2 Little’s Law and its stability assumption

  • Nigel: Dr. Little has a clear definition of system stability — the arrival rate and departure rate are stable.
  • The host intervenes to ask for a lay definition for the audience, noting Nigel “can’t even tell me what Dr. Little means by stability.”
  • Nigel: he’s “not an expert on Little’s Law at all,” but everything he’s read (including Vacanti’s work) says it assumes the system is stable.

15.3 Vacanti’s definition of Little’s Law stability

  • You need a long enough time period under observation so that long-term averages don’t change — i.e. the distribution of your data is stationary.

15.4 Shewhart’s different definition of stability

  • Vacanti: Shewhart has a different definition — all process data is characterized by variation, and using Shewhart’s formulas you can characterize whether all data falls within accepted limits of variation.
  • If everything is within those normal/accepted control limits, you have a stable system.
  • Crucially, this says nothing about team size, complexity, or what management is doing.

15.5 The host’s stable-vs-predictable distinction

  • Terhorst-North offers a distinction:
    • Predictable = you can name the characteristics/independent variables that make the system change, and their distributions — the system may be “super spiky” but spiky in a predictable way (not stable, but predictable). Example: fractals — easy to describe, but not stable.
    • Stable = those factors are within bounds.

15.6 The contrapositive fight

  • Vacanti: per Shewhart, if cycle-time data is stable, it is predictable — but the contrapositive is not true (predictable does not imply stable) is exactly what the host claims and Vacanti disputes.
  • Vacanti: “I can give a distribution for each input to a Monte Carlo simulation, run it, and tell you how many projects come in within a period — and the individual cycle times could be all over the place and I’m still right.”
  • But: if the data fed in doesn’t fit Shewhart’s definition of stability, then the output isn’t stable — which “makes no sense” to the host.

15.7 Gaia on stationarity

  • Gaia: she’s unsure about the “stability” concept as used. If “stable” means stationary, you also need variance to be stable, not just expectation — the full distribution stable across time.
  • Backing Daniel’s point: you can have something predictable but not stable — variability changes over time, but if you know the dynamics of the variability (e.g. it changes predictably around holidays), you can still predict “in a predictable good way.”
  • She notes the definition of stability given differed from the definition of stationarity — a source of confusion.

16. The Panel “Fails” — Fundamental Disagreement on Terms

16.1 The host names the failure

  • Terhorst-North: “with all due respect, fundamentally this is where this panel has failed” — before you can argue, you must agree what you’re arguing about.
  • There is fundamental disagreement on what a distribution means, what stability means, and what predictability means.

16.2 Vacanti’s sharp closing exchange

  • Nigel: “when I come at it from a Shewhart perspective, you don’t have that in your head.”
  • Vacanti: Shewhart is “one person who has an opinion about stability”; there are many definitions.
  • Vacanti’s challenge: “If you can point me to somebody I should trust more than Dr. Little or Dr. Shewhart, I’m all ears. But between listening to Nigel or listening to Dr. Shewhart, I can tell you who I’m going to listen to.”
  • The host takes this “as a closing remark” — “the panel has failed. We didn’t even get past the fundamentals… sounds like a bunch of us have some reading to do.”

17. Closing Remarks

17.1 Colleen — go practice

  • Everyone should go practice with a Monte Carlo to understand the heavy concepts they jumped into.
  • It doesn’t have to be hard: “you have the data you need, you can do this in a spreadsheet.”
  • Randomize your data, see how much variability comes through the forecast, and understand risk in a new way.
  • The goal is to free developers from “hours of story pointing” so they can code more — “not to have perfect dates.”
  • She adds: “I’m not advocating story pointing, by the way — that’s a different panel on a different day.”

17.2 Nigel — go study

  • “I need to go study because I’m hearing there’s no such thing as a distribution — all the statistics and mathematics professors got that wrong.”
  • He spent a lot of time reading and talking to people he respects before the panel.
  • On Shewhart: “he’s the father of SQC (Statistical Quality Control)… the Six Sigma guys took that and bastardized it.”
  • He concedes he’s “out of my depth” on modeling/distributions/statistics — but heard Vacanti disagree with things that seem “foundational teaching in the topic.”

17.3 Gaia — the last word

  • “Now it comes personal. I don’t have to justify my professionalism in statistics — you can look at my CV.”
  • Being told to “go and practice with Monte Carlo” and that she doesn’t know what a distribution is: “go and check my CV — I think that will speak by itself.”
  • Still, “it was a good conversation,” and she agrees there’s a disagreement in terminology.

17.4 The host wraps up

  • “We’ve all got some homework to do” — find out what distributions, stability, and predictability are.
  • Thanks the panel for “all of your energy.”

People & References Cited

  • Daniel Terhorst-North — host/moderator of the panel.
  • Daniel Vacanti — panelist; works with Colleen at ProKanban.org; author of books Nigel read; 2019 Little’s Law article referenced; argues “there is no (well-known) distribution.”
  • Colleen Johnson — panelist; CEO of ProKanban.org; advocate of throughput-based forecasting without estimation.
  • Nigel Thurlow — panelist; self-described “lean guy” with a Deming background; author of the “Monty Python Simulation” article.
  • Gaia Bashiri — panelist (remote); trained statistician; solution & delivery manager in insurance risk management.
  • Dave West — referenced as in the audience; credited by Nigel with the phrase “Monty Python syndrome.”
  • W. Edwards Deming — cited by Nigel: “a system must be understood as a whole”; variation and tampering.
  • Dr. John Little (Little’s Law) — cited on system stability (arrival rate = departure rate; long-term averages don’t change / stationary).
  • Walter Shewhart — cited on a control-chart definition of stability (data within accepted limits of variation); called “father of SQC.”
  • Albert Einstein / relativity — Gaia’s example of a model as a useful made-up construct.
  • Grok and ChatGPT — used by Nigel to get book summaries in preparation.
  • Tools/methods: Monte Carlo simulation, empirical / non-parametric distributions, bootstrapping, throughput, cycle time, lead time, takt time, process cycle efficiency, control charts, Six Sigma, spreadsheets for Monte Carlo, story pointing.
  • Concepts: probabilistic forecasting as tautology, empirical sampling, “the future looks like the past” assumption, distribution vs. no distribution, stability vs. predictability vs. stationarity, variance (process vs. throughput), confidence intervals / percentiles (85% vs 95%; 99.5% quantile), Solvency capital / “1-in-200-year event”, forecasts becoming targets, portfolio vs. single-project questions (“Monty Python syndrome”), risk communication with management, complexity and dependencies at scale.

Video: https://www.youtube.com/watch?v=ryFkjHxKT-M — Transcript via yt-transcript.sh; outline generated from the transcript.