Let Them Eat Code - Colleen Johnson | Craft 2025

June 04, 2026

Let Them Eat Code - Colleen Johnson (Talk Outline)

Colleen Johnson — CEO of ProKanban.org (an inclusive Kanban learning community), co-founder of ScatterSpoke (Atlassian Ventures portfolio; retrospective data → actionable improvements); 25+ years coaching agile (Wells Fargo, E*Trade, Home Depot); board roles at Agile Denver, Agile Uprising, chair of Mile High Agile. Fun fact: as a child she raised award-winning sheep at county fairs (a story she promises — and delivers). Thesis: developers spend only ~30% of their time coding, and the fix is to make the invisible visible.


1. The Cost of Lost Focus

1.1 Origin — interviewing engineering leaders

  • Early this year she interviewed engineering leaders: “If you had a blank check, what would you throw money at? What keeps you up at night? What’s hardest to fix?” — and “what’s the one metric you’re responsible for reporting up?”
  • One striking answer: “developer focus time.” How is it measured? ”I just ask them, how many hours of focus time do you think you got this week?” — “which really stresses me out.” If focus time is both the top metric and top pain point, what could make it better?

1.2 The 70% stat, in dollars

  • Developers spend ~70% of their time not writing code (a show of hands confirms it feels accurate — “I hate that for all of you”).
  • Money math (“Dan, plug your ears”): avg salary ~$150,000 → 70% ≈ $105,000/dev/year lost. 10 devs → ~$1M/year; 100 devs → ~$10M+/year — and that’s just office days, on top of the sunk cost of hiring, recruiting, and paying great engineers.
  • Where the non-coding time goes: unnecessary meetings, status reports, endless standups (someone asked Dan earlier “could we stop doing standups?” — the “quick” standup that becomes an hour), and waiting (for decisions, dependencies, prioritization, clear direction). Some non-coding time is genuinely required, but much isn’t.

1.3 Who feels the pain

  • Developers: burnout (constantly busy, no progress on what matters), context switching, work that never ships → low morale (“busy but not productive”).
  • Others: frustrated PMs, engineering leadership, up/downstream teams (cross-team dependencies, per Kent’s talk), and finance (“they don’t love those numbers either”).
  • Ultimately the customer: slow delivery, poor quality from stop/start work, and lost trust (promised and not delivered on time). “Wasted time isn’t just about productivity — it’s about focus, effectiveness, and delivering when we say we will,” and it all compounds (and gets more expensive) the more it happens.
  • Core move: make the invisible visible — expose what prevents the work that matters, so you can control how much work comes in, focus on finishing quicker, and control how long things take.

2. The Six Wastes of Software Development (Lean)

  • Context: several talks touched on lean; old agile conferences were ”lean-agile conferences.” The classic six wastes, mapped to software:
    1. Overproduction — “weird word”; think extra features / just-in-case additions (“we’ll never get back here, so let’s add a couple things”) — small bets on things that aren’t needed, taking time from what matters.
    2. Partially done work — started and never circled back to (too big, ill-defined scope, or something higher-priority arrived). The longer undeployed code sits, the more it costs — no return on investment.
    3. Defects — like tech debt, they are code, but pull you from new/higher-priority work and force context switching (“you lose ~20% every time you switch focus” — do that all day and “what’s left?”).
    4. Extra process — Scrum ceremonies (sprint planning, retrospectives, daily standup) are context switches, worse across multiple time zones (people stop work at different times). Not that they aren’t required — they’re disruptive.
    5. Waiting — delays in decisions, handoffs, and cross-team dependencies delivering one big feature together.
  • These wastes are “a big part of why only 30% of your time is spent actually writing code.”

3. Manage Capacity (WIP)

3.1 “Working on everything, finishing nothing”

  • Usually a result of too much work in progress (WIP), which shows up as:
    • Cognitive overload — 40 tickets on the board; deciding which to work on/prioritize itself drains energy and focus.
    • Context switching — more WIP → more switching → more cost.
    • Thrashing across testing/code reviews and activities.
  • Typical Jira board: people have 2–3 tickets each — “maybe they’re better at multitasking than you” — but really they’re working one and the others just sit as waste. Coming back from the conference not knowing what to work on, you grab something from To Do (“obviously what’s next”) — instead, move things to Done without starting something new; if a teammate has 3–4 tickets, pick one up / help. It’s all about capacity.

3.2 The airport analogy & WIP limits

  • Airport: you land but there’s no gate — sit on the runway 2 hours with “a lot of pissed-off passengers” (her favorite: “we’re 45 minutes early, but no gate”). Planes landing outstrip planes leaving. Same when more work enters the team than it has capacity to finish — work sits on your runway.
  • Match WIP to team capacity with a WIP limit (“only 10 planes can land because there are only 12 gates / 12 people”). First step: manage capacity.

3.3 “If you can lean, you can clean”

  • Common objection: ”Are you telling me not to work if we’re at WIP limit? Won’t my manager be mad?” Before tech, she worked a bar kitchen with signs: “if you can lean, you can clean.” At capacity, don’t start new work — advance work that’s stuck: do research, help with testing, help with code reviews. (Not “go home for the day” — find something other than starting new work.)

4. Make Priorities Visible

  • “Everything is urgent, so nothing is important.” Security teams have “one of the highest turnover rates” partly because of this — “no one wants to live like this.” Make it easy, when you have capacity, to see the single most important next thing — via priorities, clarity, and team agreements; and focus first on getting things over the finish line, not always starting from To Do.
  • Color-code by feature to make priority visible and check alignment:
    • If the #1-priority feature has zero tickets on the board → a conversation (“maybe it’s fine, maybe not”).
    • If a #5-priority feature (blue) dominates → the team is spending energy on not-the-most-important work.
  • Do this at all levels (features/epics): e.g., “our org said 20% of features should be innovation-related” — glance at the board and see 0% or 80% and react. Map work to business outcomes / strategic goals / OKRs so you can make better, faster decisions with real information.

5. Make Age Visible

  • Stagnant work: started, then pulled off → moved out of the way → out of sight, out of mind. Code/tickets age; you build new stuff on top of old code. Returning to it means re-learning requirements, revisiting where you left off, and — worse — the requirements/priorities may have changed, and stale merge conflicts on old code eat time.
  • Fix: make work item age visible. Imagine standups centered on “this ticket’s been in progress 6 days / 3 days — which first?” When age is visible you have a clear conversation: usually ”how do we get it done fastest,” sometimes it reveals a ticket that’s been de-prioritized for weeks. Options: hand it off (someone else picks it up), or split a too-big ticket into smaller ones.
  • Tools: lots of plugins exist, but you don’t need fancy — don’t trust Jira’s “dots” (you can’t tell age); instead put the start date in front of the story title before starting, and sort the board oldest-first. Also great for surfacing Scrum carryover — if work routinely exceeds two weeks, maybe a 2-week sprint is the wrong timebox.

6. The Four Flow Metrics

  • Work in progress — the actual count of work in the system (not the sum of WIP limits); varies day to day; goal is to match team capacity.
  • Throughput — a raw count of items completed per period (not story points); track daily/biweekly/monthly.
  • Cycle time — elapsed time between start and finish of a work item (“how long to complete one story/feature”).
  • Work item age — elapsed time between start and today (for unfinished work) — ”probably the most important.
  • Why they matter: most metrics (burndown, velocity — “story points is a conversation over alcohol”), and even cycle time/throughput, describe already-finished work you can’t change retroactively. WIP and age are actionable right now — look at the board and say “this is the oldest, this is what I get over the finish line first.” All this data already exists in your tools — just make it visible → a more predictable system with a steady amount of work flowing start-to-finish.

7. Reducing Distractions & Uncertainty

7.1 Make it easy to say no

  • Distractions are hard to refuse. Build a clear system: what are we working on, how much is in the system, and what are the trade-offs of picking up something new. Leaders must model this — when a PM/PO pushes work that breaks capacity, have the conversation: “we’re focused on getting this over the finish line and don’t want to exceed WIP because that work will just sit.”

7.2 The sheep story (know the outcome, cut the noise)

  • In 4-H (a US farm club for kids), 10-year-old Colleen won a bottle-fed lamb in an essay contest. To win grand champion, a sheep’s hindquarters must be strong (the judge feels them as you jam your thigh into its chest and it pushes back). She was told to run the lamb — but sheep hate that; harnessed, it somersaulted face-first into the dirt, and she came home “crying, dirty, knees skinned up, pissed off.”
  • Her dad’s better idea: mount a busted kitchen sink on a sawhorse with boards so the sheep had to stand on its hind legs to eat and drink, raising it as they got comfortable. The next year she won grand champion and reserve grand champion — “we knew the outcome we needed to drive to, so we cut out all the noise.
  • Lesson: teams are busy closing tickets but don’t know where they’re going. Define the goal (complete this feature, deliver this product), then cut the noise and focus on delivering.

7.3 Forecasting & trade-offs

  • Reduce uncertainty like using Google Maps even when you know the way (to avoid traffic) — looking for updated, real-time information, because software changes daily. Use probabilistic forecasting (books by “Nick and Dan” in the front row) instead of estimation to reduce uncertainty and skip estimation debates.
  • Everything is a trade-off. (She’s married to a developer, which “backfired” — asked to do something, he replies “do you want me to take the trash out first or unload the dishwasher?” — “shit, I did this to myself.“) When a stakeholder says “this is higher priority, start it,” a good trade-off conversation (“this ticket could be done tomorrow if I stay focused; if I switch, it slips to next week”) gives them better information to decide — they may not relent, but the decision is informed.
  • Bottom line: developer focus is organizational health — focused developers build better products, are happier and less stressed. Start by making WIP and age visible and having trade-off conversations. Distractions “aren’t just annoying, they’re really expensive” — and the hardest cost to recover is lost talent when great people leave for lack of focus.
  • (Plug: ProKanban.org has a free Slack community that “nerds out” on these charts, forecasting, and extracting data from tools.)

8. Q&A

  • Most persuasive argument to shift leaders from estimates to forecasting? Accuracy matters, but for engineering leaders start with time spent estimating: of the 70% non-coding time, how much is estimation? It’s not just the weekly story-pointing hour — it’s all the upfront work making stories “perfect” (requirements, developer input) so estimates are “perfect” (they never are). Better use of dev time: keep writing code so throughput and cycle-time data can forecast delivery more accurately than guessing at stories six months out.
  • Multiple stakeholders, conflicting priorities out of our control — how to prioritize? Visibility. Nothing changes overnight, but highlight how focus is spread across priorities. The more work pulled in at feature/epic/project level, the longer everything takes. (She’ll share ProKanban tools that show what happens as the number of priorities increases.)
  • Offering to help with someone’s WIP makes them feel insecure / “slow” — how to make help okay? Kanban saying: “manage the work, not the people.” With data it stops being “John, why has your ticket been in progress so long?” and becomes “our service-level expectation is 85% of tickets done in ≤14 days; yours is about to hit 15 — should someone help or swarm it?” — a conversation about work and data, not calling someone out.
  • Meetings (standups, planning, retros, bug-fix) become waste — metrics to optimize them? “Almost always more waste than good, unfortunately.” Use the flow metrics: a retrospective should look at throughput and cycle-time data (marry quantitative + qualitative — “if you’re not, you shouldn’t be doing a retro”). Use throughput data for sprint planning → faster planning, and no need for six months of pre-pointed stories (forecast from past throughput).
  • From what moment do you measure work item age? Great question — everyone assumes a different start (customer, product owner, developer pulling into dev). She can’t answer it for you: decide as a team and be explicit when the clock starts. Some teams start at a To Do column (e.g., WIP limit of 3 there); you can also track multiple start points (e.g., dev → ready-for-test). “The most important thing is measuring it consistently.” (Analogy: how long it takes her to “get ready” — she counts from out-of-bed, husband counts the 45 minutes + two coffees.)
  • Waiting 2–3 days for code review — how to improve? Visibility again. Separate the development column from the code-review column to see the congestion. Caution: same people do both — with 5 devs, a WIP of 5 in dev and 5 in review leaves something idle; balance capacity across the two activities (e.g., 3 in dev, 2 in review).
  • How to kickstart a fresh backlog for a brand-new squad?Don’t.” Backlogs are “one of the biggest time sucks” — time defining work you may never reach. Define work just in time, with a small runway (less than you’d think). “Maybe one of the biggest failings of Scrum” is planning/estimating work months before starting it — review stories right before you start them for better context.
  • You said ~30% coding — what’s a good target? 50/60/70? “I’d hope more than half.” Investing $10M in developers, you’d want more than half spent coding — “it’s what you love to do and why you’re in this field.”
  • (Closing gift: socks.)

People, Tools & References Cited

  • Colleen Johnson — speaker; CEO of ProKanban.org; co-founder of ScatterSpoke.
  • “Nick and Dan” (front row) — books on probabilistic forecasting (Kanban/flow — Vacanti/Roock referenced by first name).
  • Concepts: developer focus time; the six lean wastes (overproduction, partially-done work, defects, extra process, waiting); WIP limits & capacity (airport analogy); “if you can lean, you can clean”; “manage the work, not the people”; color-coding by feature; work-item age (start-date-in-title, sort oldest-first); the four flow metrics (WIP, throughput, cycle time, work-item age); service-level expectations; probabilistic forecasting vs. estimation; just-in-time backlog; trade-off conversations; the sheep/grand-champion parable.

Video: https://www.youtube.com/watch?v=Rw-ZZv0H7ME — Transcript via yt-transcript.sh; outline generated from the transcript.